This project includes the deployment of a network infrastructure and a UPS power outlets infrastructure as well as required hardware and off-the–shelf software applications for the CLH. The technical needs assessment was conducted and it covered the following activities:
- A detailed study and requirements analysis of both the network and the UPS power outlets infrastructures.
- A needs assessment of the current available hardware and software.
- The preparation of a schedule of requirements, a scope of work, a cost estimate and a proposed implementation plan.