This project addresses the ICT needs of the above described project unit with its regional offices. It is limited to the deployment of a small number of PCs, peripherals and photocopiers.... للمزيدMorePlus |
-
The Performance Improvement and Modernization plan for the CSC resulted in the implementation of a number of activities such as drafting of a general policy framework for a modern human resource ... للمزيدMorePlus |
-
During the course of 2003, OMSAR received requests for technical assistance from the ENA, the Ministry of Agriculture, the Ministry of Energy and Water, the Ministry of Public Health, the Directorate... للمزيدMorePlus |
-
The technical needs assessment was conducted and it covered the following activities:
A detailed study and analysis of the current network infrastructure requirements.
A needs assessment of t... للمزيدMorePlus |
-
This project includes the deployment of a network infrastructure and a UPS power outlets infrastructure as well as required hardware and off-the–shelf software applications for the CLH. The techni... للمزيدMorePlus |
-
A fact-finding mission that took place during 2002 at the various Lebanese diplomatic offices in France resulted in a report that recommended the procedures which were the most likely ... للمزيدMorePlus |
-
The project created the “National Electronic Archiving and Retrieval” (NEAR) system that allow to:
Electronically capture, store, organize, share, retrieve and protect the holdings of the NAR
E... للمزيدMorePlus |
-
The project covers the following activities:The project covers the provision of a WF/DMS, HRMS and accounting system for the ECOSOC.
... للمزيدMorePlus |
-
This project provides the Lebanese Agricultural Research Institute with data collection equipment and modern statistical tools for information analysis to improve the capacity and accuracy of agricul... للمزيدMorePlus |
-
In order to enhance its services to the public, a joint OMSAR/NEO committee devised a project with the aim of implementing an online web-based Human Resources Matching System that facilitates (a) co... للمزيدMorePlus |
-
For this project, OMSAR adopted a brand new approach that will combine both the GIS and the DMS needs of the LRA into one integrated application. This integrated approach will eliminate duplication... للمزيدMorePlus |
-
A technical needs assessment for the required DMS was conducted and it covered the following activities:
A detailed study and analysis of the DMS needs and information/data sources a... للمزيدMorePlus |
-
The project addresses the implementation of an up-to-date document management/archiving system application to ensure the synchronization, integration and fast accessibility of all the information a... للمزيدMorePlus |
-
The system has been designed to connect all the CR offices throughout Lebanon whereby the exchange of data and images of all official documents will be feasible. As the CR is also a publishing to... للمزيدMorePlus |
-
The project includes the provision of servers, personal computers, scanners, and communication equipment to link the ministry's main building in Beirut with the regional labor offices in Tripoli, Zah... للمزيدMorePlus |
-
The scope of work of this project consists of the provision and implementation of the hardware required to operate the documentation software application that is being provided by the United Natio... للمزيدMorePlus |
-
This project covers the full implementation of a centralized information system, including all necessary equipment, software application, training and data entry.
The current scope of the proj... للمزيدMorePlus |
-
The scope of work of this project consists of the provision and implementation of an information system covering the hardware, software application development and training components to... للمزيدMorePlus |
-
Several projects were devised and carried out during 2003 to answer the requests for equipment and infrastructure that OMSAR is receiving in increasing numbers. The beneficiaries included, but are ... للمزيدMorePlus |
-
The first phase of the overall automation plan includes the establishment of the PCM’s automation infrastructure, the provision of computer hardware and peripherals and the creation of a data cente... للمزيدMorePlus |
-
The following services and deliverables were requested from the Consultancy Team:
e-Readiness assessment document
e-Strategy document highlighting priorities
A preliminary implementati... للمزيدMorePlus |
-
With the technical assistance of a GIS consultant hired by OMSAR, the national GIS coordination committee worked on:
Assessing the feasibility of developing a national base map for the country ... للمزيدMorePlus |
-
This project comprises two components:
A global strategic study of the NSSF, covering each of its main activities
An Information System Master Plan.
As part of this master plan, a global work... للمزيدMorePlus |
-
This national goal focuses on developing qualitative and quantitative indicators or benchmarks on government operations and services before they are modernized and automated so as to be ... للمزيدMorePlus |
-
The purpose of this project was to draft a communication strategy and develop its action plan... للمزيدMorePlus |
-
The scope of this project was to develop and implement an “Administrative Media Campaign” which aims at involving the media and the civil society in the administrative reform program... للمزيدMorePlus |
-
This project is going to focus on studying the existing regulatory and functional framework of internal regulations and related procedures which hinder or facilitate the relationship and interaction ... للمزيدMorePlus |
-
The scope of work of this project consists of the provision and implementation of an GIS/database system covering the software packages, hardware and required training components.... للمزيدMorePlus |
-
The scope of work of this project consists of the provision and implementation of the hardware required to operate the WHO EPIinfo software application. ... للمزيدMorePlus |
-
The scope of work of this project consists of implementing an integrated solution covering hardware, software applications and training to digitize the collections of photos, maps, painting, drawi... للمزيدMorePlus |
-
The automation of the Ministry of Displaced project covers the implementation of a new ICT infrastructure network (phase I) and providing the Ministry with new servers, computers, network printers, ... للمزيدMorePlus |
-
This technical assistance assignment was contracted in December 2002 and completed in June 2003. It covered the following activities:
A detailed survey and analysis of the current business inform... للمزيدMorePlus |
-
The overall automation plan includes several elements and is currently being implemented over several phases. The first phase, by now complete, included the Parliament's automation infrastructure, ha... للمزيدMorePlus |
-
The project being currently implemented at the LARI covers the rehabilitation and completion of the automation infrastructure at its main location in Tall Amara, hardware and related software package... للمزيدMorePlus |
-
Since mid year 2001, twenty administrative procedures in seven public administrations and agencies have been streamlined by a team of international and local experts from OMSAR, the Dire... للمزيدMorePlus |
-
The scope of work entails the following:
Analysis and design of the application software.
Development and implementation of the application software in the MoPH.
Providing additional Database li... للمزيدMorePlus |
-
The project automated and improved many of the work methods and procedures that take place at the central site of the MoSA. This project is considered as the logical continuation of the efforts tha... للمزيدMorePlus |
|